• svg
  • svg
  • svg

Head Office in ECUADOR

Address: Calle Capitán Ramón Borja E10-154 y Av. Eloy Alfaro

Request a Quote

Looking for a quality and affordable builder for your next project?

* Please Fill Required Fields *
img

Phone Number:

PBX: +(593) 2 380 1480

Office Working hours:

8:30 am to 17:00 pm from Monday to Friday

    • svg
    • svg
    • svg

    Head Office in ECUADOR

    Address: Calle Capitán Ramón Borja E10-154 y Av. Eloy Alfaro

    Request a Quote

    Looking for a quality and affordable builder for your next project?

    * Please Fill Required Fields *
    img

    Phone Number:

    PBX: +(593) 2 380 1480

    Office Working hours:

    8:30 am to 17:00 pm from Monday to Friday

    Administrative Building, Renovation, Iquitos – Peru

     

    The project is located inside a Peruvian Navy Base in the city of Iquitos, capital city of Loreto Region. Iquitos is located in the northeastern part of the country and it is considered the largest metropolis within the Peruvian Amazon.  However, since it is surrounded by the Amazonas delta, the only commercial access to the city is through the river commercial routes, demanding a very complex logistic plan.

    This project was designed to comply with US Standards and it consists of interior and exterior renovation with second floor addition to the administrative wing of an existing building compound, including lab storage, accessioning and hazmat areas, lab freezer, and new 350KVA generator.

    Construction required a three-phase plan.  Client required its facilities to have uninterrupted services despite the construction works, which involved the conditioning of a swing space outside the existing compound, for temporal client activities..

    • Category

      Institutional – Research Laboratory
    • Project Owner

      US Army Corps of Engineers (USACE)
    • Final User

      Naval Medical Research Unit 6 (NAMRU-6) - Iquitos
    • Location

      Iquitos - Peru
    • Service

      Construction with Incidental Design
    • Project Range

      $ USD 3MM - 5MM
    • Completion Date

      October, 2019
    • Building Area

      (396 m2) 4,264 SQF
    To Top